		<title>News and construction progress</title>
		<link>https://allengyo.com.tr</link>
		<language>ru</language>
		<item turbo="true">
			<title>Construction permit is issued</title>
			<link>https://allengyo.com.tr/tpost/3nos7ggz61-construction-permit-is-issued</link>
			<amplink>https://allengyo.com.tr/tpost/3nos7ggz61-construction-permit-is-issued?amp=true</amplink>
			<pubDate>Tue, 15 Aug 2023 00:04:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3730-3030-4266-b232-343964623739/pexels-jeshootscom-8.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Construction permit is issued</h1></header><figure><img src="https://static.tildacdn.com/tild3730-3030-4266-b232-343964623739/pexels-jeshootscom-8.jpg"/></figure><div class="t-redactor__text">On August 10, 2023, the Buyukcekmece District Municipality issued us a building permit. This is the main document, without which in Turkey it is not allowed to even prepare for construction on the site. The issuance of a building permit was preceded by a long period of designing our villas, coordinating sections of the project with various departments of the city hall, paying state fees and obtaining a permit for excavation.<br /><br /><br /><br />Preparations for construction are in full swing: contractors, building inspectors and suppliers must be brought together as soon as possible.<br /><br /><br /><br />Follow the news on the site. Here we will publish photos and videos from the construction site, as well as comment on the construction stage.</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Safety and quality come first</title>
			<link>https://allengyo.com.tr/tpost/kxm37i3ec1-safety-and-quality-come-first</link>
			<amplink>https://allengyo.com.tr/tpost/kxm37i3ec1-safety-and-quality-come-first?amp=true</amplink>
			<pubDate>Tue, 15 Aug 2023 00:07:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3133-6636-4430-b362-326265346330/photo_2023-08-14_23-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Safety and quality come first</h1></header><figure><img src="https://static.tildacdn.com/tild3133-6636-4430-b362-326265346330/photo_2023-08-14_23-.jpg"/></figure><div class="t-redactor__text">December 2022. We were asked why we want a margin of safety and more expensive solutions in the project. Answer: our team consists of experienced practical engineers who have implemented construction projects for a number of American, European and Russian companies. For us, the solutions that are found in 99% of Istanbul's construction projects are categorically unacceptable.<br /><br /><br /><br />We do not want to risk the lives of people close to us and our customers. We believe that the victims of the February 2023 earthquake could have been avoided if every house was built using technology and without saving on materials.<br /><br /><br /><br />In our villas, we have provided a particularly strong foundation - under the construction area of 80 sq.m. 42 piles with a diameter of 450 mm to a depth of 10 meters will be installed.<br /><br /><br /><br />The project involves the use of C30 concrete with waterproofing additives.<br /><br /><br /><br />Follow our news!<br /><br /></div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Geodetic marking</title>
			<link>https://allengyo.com.tr/tpost/om77tf1e11-geodetic-marking</link>
			<amplink>https://allengyo.com.tr/tpost/om77tf1e11-geodetic-marking?amp=true</amplink>
			<pubDate>Tue, 19 Sep 2023 15:14:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3961-6135-4131-b164-306663303733/photo_2023-09-19_14-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Geodetic marking</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild3961-6135-4131-b164-306663303733/photo_2023-09-19_14-.jpg"/><img src="https://static.tildacdn.com/tild3631-3161-4031-a464-363038643366/photo_2023-09-19_14-.jpg"/></div><div class="t-redactor__text">On September 19, 2023, geodetic marking of the site was made. The angles of the future building and the zero mark were determined. The zero mark is the starting point when projecting drawings onto a house under construction.<br /><br />Next on the plan is excavation work and installation of piles. Follow the news on the website!</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>The pit is ready. The building bar have arrived. The drilling of piles has begun</title>
			<link>https://allengyo.com.tr/tpost/1szv8hpe91-the-pit-is-ready-the-building-bar-have-a</link>
			<amplink>https://allengyo.com.tr/tpost/1szv8hpe91-the-pit-is-ready-the-building-bar-have-a?amp=true</amplink>
			<pubDate>Sat, 23 Sep 2023 20:31:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild6539-3839-4533-b362-316262376632/20230921_121142.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>The pit is ready. The building bar have arrived. The drilling of piles has begun</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild6539-3839-4533-b362-316262376632/20230921_121142.jpg"/><img src="https://static.tildacdn.com/tild6532-6133-4166-b537-626435613765/20230921_163921.jpg"/><img src="https://static.tildacdn.com/tild3930-3563-4564-a263-626663383431/20230923_103700.jpg"/><img src="https://static.tildacdn.com/tild3864-6533-4734-a432-393035386361/20230923_140037.jpg"/><img src="https://static.tildacdn.com/tild6566-3663-4134-b463-306564633931/20230923_140047.jpg"/><img src="https://static.tildacdn.com/tild3766-3737-4866-b137-346138663535/20230923_141421.jpg"/></div><div class="t-redactor__text">In the period from 09.20.2023 to 09.23.2023, a pit with a volume of 450 cubic meters was dug, control measurements of points and construction depth were made, building bar for the installation of piles were delivered, and drilling began.</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Drilling and inforcement of piles are completed</title>
			<link>https://allengyo.com.tr/tpost/i6mnxoimx1-drilling-and-inforcement-of-piles-are-co</link>
			<amplink>https://allengyo.com.tr/tpost/i6mnxoimx1-drilling-and-inforcement-of-piles-are-co?amp=true</amplink>
			<pubDate>Sat, 30 Sep 2023 13:16:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild6361-3034-4136-b239-356437396535/photo_2023-09-30_13-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Drilling and inforcement of piles are completed</h1></header><figure><img src="https://static.tildacdn.com/tild6361-3034-4136-b239-356437396535/photo_2023-09-30_13-.jpg"/></figure><div class="t-redactor__text">09/29/2023 completed drilling and reinforcement of 42 piles</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Pile field and concrete preparation for the future foundation have been completed</title>
			<link>https://allengyo.com.tr/tpost/1gm9mp0zo1-pile-field-and-concrete-preparation-for</link>
			<amplink>https://allengyo.com.tr/tpost/1gm9mp0zo1-pile-field-and-concrete-preparation-for?amp=true</amplink>
			<pubDate>Wed, 11 Oct 2023 12:06:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3363-6661-4862-b864-623732393038/photo_2023-10-11_12-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Pile field and concrete preparation for the future foundation have been completed</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild3363-6661-4862-b864-623732393038/photo_2023-10-11_12-.jpg"/><img src="https://static.tildacdn.com/tild3235-6435-4465-b334-383038623937/photo_2023-10-11_12-.jpg"/><img src="https://static.tildacdn.com/tild3462-6237-4230-a532-656631663434/photo_2023-10-11_12-.jpg"/><img src="https://static.tildacdn.com/tild6232-6533-4962-b765-333435313034/photo_2023-10-13_00-.jpg"/></div><div class="t-redactor__text">On October 10, 2023, work on pouring concrete on piles, marking, and concrete preparation for further foundation work was completed</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Earthquake-resistant foundation is ready</title>
			<link>https://allengyo.com.tr/tpost/9rtuk4lbx1-earthquake-resistant-foundation-is-ready</link>
			<amplink>https://allengyo.com.tr/tpost/9rtuk4lbx1-earthquake-resistant-foundation-is-ready?amp=true</amplink>
			<pubDate>Fri, 13 Oct 2023 00:14:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3232-6535-4762-b365-353935616631/photo_2023-10-13_00-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Earthquake-resistant foundation is ready</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild3232-6535-4762-b365-353935616631/photo_2023-10-13_00-.jpg"/><img src="https://static.tildacdn.com/tild3536-3530-4163-b161-386365623435/photo_2023-10-13_00-.jpg"/><img src="https://static.tildacdn.com/tild6633-3762-4461-b262-623662383264/photo_2023-10-13_00-.jpg"/></div><div class="t-redactor__text">On October 13, 2023, work was completed on the construction of a complex earthquake-resistant foundation consisting of the following elements:<br /><br />42 seven-meter monolithic piles with a diameter of 0.45 m at a depth of - 11.10 m to - 4.10 m,<br />solid concrete grillage 0.3 m high,<br />movable cushion made of pebbles 0.1 m thick,<br />final layer of concrete 0.1 m thick.<br /><br /><br />Further according to the plan: waterproofing and basement floor made of monolithic concrete walls</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Formwork and waterproofing of the basement</title>
			<link>https://allengyo.com.tr/tpost/m3a42mhzx1-formwork-and-waterproofing-of-the-baseme</link>
			<amplink>https://allengyo.com.tr/tpost/m3a42mhzx1-formwork-and-waterproofing-of-the-baseme?amp=true</amplink>
			<pubDate>Sun, 22 Oct 2023 23:23:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild6632-3338-4531-b339-623733633832/photo_2023-10-22_22-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Formwork and waterproofing of the basement</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild6632-3338-4531-b339-623733633832/photo_2023-10-22_22-.jpg"/><img src="https://static.tildacdn.com/tild3238-3431-4432-b438-373261616432/photo_2023-10-22_22-.jpg"/><img src="https://static.tildacdn.com/tild6431-3032-4761-b664-653631306637/photo_2023-10-22_22-.jpg"/></div><div class="t-redactor__text">10/17/2023 - 10/18/2023 formwork was made from ceramic blocks with waterproofing</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Reinforcement of the slab and laying of communications</title>
			<link>https://allengyo.com.tr/tpost/5bore563s1-reinforcement-of-the-slab-and-laying-of</link>
			<amplink>https://allengyo.com.tr/tpost/5bore563s1-reinforcement-of-the-slab-and-laying-of?amp=true</amplink>
			<pubDate>Sun, 22 Oct 2023 23:40:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3237-3933-4264-b036-396661376564/photo_2023-10-22_22-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Reinforcement of the slab and laying of communications</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild3237-3933-4264-b036-396661376564/photo_2023-10-22_22-.jpg"/><img src="https://static.tildacdn.com/tild3064-3631-4661-b033-323938316339/photo_2023-10-22_22-.jpg"/><img src="https://static.tildacdn.com/tild3631-6361-4463-b739-316431613234/photo_2023-10-22_22-.jpg"/></div><div class="t-redactor__text">10/20/2023 reinforcement of the monolithic slab of the basement floor was completed. Reinforcement with a diameter of 16 mm with a pitch of 170 mm was used. Water drainage and grounding communications are laid.</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Pouring the concrete slab and starting the construction of wall formwork</title>
			<link>https://allengyo.com.tr/tpost/909uu7v161-pouring-the-concrete-slab-and-starting-t</link>
			<amplink>https://allengyo.com.tr/tpost/909uu7v161-pouring-the-concrete-slab-and-starting-t?amp=true</amplink>
			<pubDate>Sun, 22 Oct 2023 23:58:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3333-3335-4064-a137-636330356332/photo_2023-10-22_22-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Pouring the concrete slab and starting the construction of wall formwork</h1></header><figure><img src="https://static.tildacdn.com/tild3333-3335-4064-a137-636330356332/photo_2023-10-22_22-.jpg"/></figure><div class="t-redactor__text">10/20/2023 - 10/21/2023 the slab was poured with concrete and started the construction of formwork for the walls of the basement floor</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>The reinforcement and concreting of the ground floor has been completed.</title>
			<link>https://allengyo.com.tr/tpost/gy1aafxtr1-the-reinforcement-and-concreting-of-the</link>
			<amplink>https://allengyo.com.tr/tpost/gy1aafxtr1-the-reinforcement-and-concreting-of-the?amp=true</amplink>
			<pubDate>Mon, 30 Oct 2023 22:24:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3230-3866-4961-b763-313336666336/20231030_222920.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>The reinforcement and concreting of the ground floor has been completed.</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild3230-3866-4961-b763-313336666336/20231030_222920.jpg"/><img src="https://static.tildacdn.com/tild3061-3732-4561-b736-393734636166/20231030_222857.jpg"/></div><div class="t-redactor__text">In the period from 10/22/2023 to 10/29/2023, the reinforcement of the basement walls and the manufacture of formwork were carried out. On 30.10.2023, C35 concrete was poured with water-repellent additives.</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>The formwork and reinforcement of the first floor slab have been completed</title>
			<link>https://allengyo.com.tr/tpost/jcdgbnkit1-the-formwork-and-reinforcement-of-the-fi</link>
			<amplink>https://allengyo.com.tr/tpost/jcdgbnkit1-the-formwork-and-reinforcement-of-the-fi?amp=true</amplink>
			<pubDate>Sun, 05 Nov 2023 22:17:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3733-6432-4262-a236-323931316435/photo_2023-11-05_21-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>The formwork and reinforcement of the first floor slab have been completed</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild3733-6432-4262-a236-323931316435/photo_2023-11-05_21-.jpg"/><img src="https://static.tildacdn.com/tild6564-3263-4735-b563-343864383339/photo_2023-11-05_21-.jpg"/><img src="https://static.tildacdn.com/tild6162-6236-4530-b335-323938336639/photo_2023-11-05_21-.jpg"/></div><div class="t-redactor__text">11/05/2023 the installation of formwork and reinforcement of the first floor slab was completed. To facilitate the floor structure, between  integrated beams were designed the voids.<br /><br />In most construction сases in Turkey, at this stage do not think about laying communications; Here, holes are subsequently drilled in the concrete for communications, thereby damaging the reinforcement and strength of the slab.<br /><br />Our design team of engineers installed sleeves for future communications in the floor slab without compromising the integrity of the reinforcement.</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Waterproofing work completed</title>
			<link>https://allengyo.com.tr/tpost/45tdf0j8u1-waterproofing-work-completed</link>
			<amplink>https://allengyo.com.tr/tpost/45tdf0j8u1-waterproofing-work-completed?amp=true</amplink>
			<pubDate>Mon, 13 Nov 2023 12:28:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild6532-3538-4337-b066-663566383438/photo_2023-11-13_12-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Waterproofing work completed</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild6532-3538-4337-b066-663566383438/photo_2023-11-13_12-.jpg"/><img src="https://static.tildacdn.com/tild6463-3962-4564-a332-663537316432/photo_2023-11-13_12-.jpg"/><img src="https://static.tildacdn.com/tild3137-3035-4263-a539-313333343835/photo_2023-11-13_12-.jpg"/><img src="https://static.tildacdn.com/tild3234-6662-4466-b935-343565396166/photo_2023-11-13_12-.jpg"/></div><div class="t-redactor__text">11/12/2023 waterproofing work was completed:<br />- the walls were cleared of unevenness<br />- small voids were filled with a special repair compound<br />- the surface was primed and waterproofed with a special polymer-bitumen composition<br />- extruded polystyrene was glued on top<br />- before filling with soil, the materials are protected with a special drainage membrane<br />- a drainage pipe is laid around the perimeter of the building to remove precipitation</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Monolithic works on the entrance and first floor are nearing completion</title>
			<link>https://allengyo.com.tr/tpost/3xkt93tkd1-monolithic-works-on-the-entrance-and-fir</link>
			<amplink>https://allengyo.com.tr/tpost/3xkt93tkd1-monolithic-works-on-the-entrance-and-fir?amp=true</amplink>
			<pubDate>Mon, 04 Dec 2023 11:26:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3533-6262-4462-a361-663432386232/photo_2023-12-04_11-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Monolithic works on the entrance and first floor are nearing completion</h1></header><figure><img src="https://static.tildacdn.com/tild3533-6262-4462-a361-663432386232/photo_2023-12-04_11-.jpg"/></figure><div class="t-redactor__text">12/02/2023 casting of monolithic columns of the first floor was completed. The monolithic frame is reinforced with 16mm reinforcement and filled with concrete grade C35</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Monolithic works are nearing completion</title>
			<link>https://allengyo.com.tr/tpost/41mbt6ezj1-monolithic-works-are-nearing-completion</link>
			<amplink>https://allengyo.com.tr/tpost/41mbt6ezj1-monolithic-works-are-nearing-completion?amp=true</amplink>
			<pubDate>Sat, 06 Jan 2024 12:43:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild6536-6135-4363-b335-616530646430/photo_2024-01-06_12-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Monolithic works are nearing completion</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild6536-6135-4363-b335-616530646430/photo_2024-01-06_12-.jpg"/><img src="https://static.tildacdn.com/tild3531-3962-4565-b366-623938336636/photo_2024-01-06_12-.jpg"/><img src="https://static.tildacdn.com/tild3261-3335-4731-b535-383136656532/photo_2024-01-06_12-.jpg"/><img src="https://static.tildacdn.com/tild3435-3239-4430-a261-303034356365/photo_2024-01-16_16-.jpg"/></div><div class="t-redactor__text">On 01/02/2024, the slab of the last floor was poured with concrete. Work continues on the construction of monolithic stairs and a concrete fence along the perimeter of the site.</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Monolithic work has been completed. Beginning of wall construction</title>
			<link>https://allengyo.com.tr/tpost/go97tfr9x1-monolithic-work-has-been-completed-begin</link>
			<amplink>https://allengyo.com.tr/tpost/go97tfr9x1-monolithic-work-has-been-completed-begin?amp=true</amplink>
			<pubDate>Mon, 12 Feb 2024 20:43:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3333-3465-4239-a266-613334663938/20240212_092746.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Monolithic work has been completed. Beginning of wall construction</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild3333-3465-4239-a266-613334663938/20240212_092746.jpg"/><img src="https://static.tildacdn.com/tild3730-6166-4330-b066-303266633436/20240212_092625.jpg"/><img src="https://static.tildacdn.com/tild3235-6431-4366-a165-653037306135/20240212_093945.jpg"/><img src="https://static.tildacdn.com/tild6431-3964-4561-b037-313563656166/20240212_121959.jpg"/><img src="https://static.tildacdn.com/tild6437-3038-4536-b539-333636653436/IMG-20240212-WA0032.jpeg"/></div><div class="t-redactor__text">All monolithic work at the site has been completed. The frame and outer perimeter are poured, the formwork is removed and removed from the construction site. Construction debris was removed and the soil was leveled to the design level.<br /><br />The brick supplier has been selected. The house will be made not from classic ceramic hollow bricks, but from Bims blocks, which are somewhat more expensive, but have a number of advantages:<br />- enhanced strength, including for fastening in-house equipment and furniture<br />- locking connection between blocks<br />- environmental friendliness due to natural pumice filling<br />- improved sound insulation properties<br /><br />A contractor has been selected to build the walls. The main condition is to tie the walls every 4 rows at the points of contact with monolithic columns, which the vast majority of contractors in Turkey do not do. This requirement will provide additional strength to the building and safety for residents.</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>The laying of walls and partitions has been completed</title>
			<link>https://allengyo.com.tr/tpost/h0lakzzd61-the-laying-of-walls-and-partitions-has-b</link>
			<amplink>https://allengyo.com.tr/tpost/h0lakzzd61-the-laying-of-walls-and-partitions-has-b?amp=true</amplink>
			<pubDate>Sun, 10 Mar 2024 22:52:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild6237-3066-4137-b362-656162646162/IMG-20240318-WA0268.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>The laying of walls and partitions has been completed</h1></header><figure><img src="https://static.tildacdn.com/tild6237-3066-4137-b362-656162646162/IMG-20240318-WA0268.jpg"/></figure><div class="t-redactor__text">On March 10, 2024, the laying of walls and partitions from the BIMS block  and the frame of the future attic floor and roof were completed.</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Door lintels</title>
			<link>https://allengyo.com.tr/tpost/xib4md3rh1-door-lintels</link>
			<amplink>https://allengyo.com.tr/tpost/xib4md3rh1-door-lintels?amp=true</amplink>
			<pubDate>Sun, 10 Mar 2024 23:05:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3933-6364-4561-b364-633530306532/Untitled-1.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Door lintels</h1></header><figure><img src="https://static.tildacdn.com/tild3933-6364-4561-b364-633530306532/Untitled-1.jpg"/></figure><div class="t-redactor__text">On the left it is shown how they do it in the vast majority of houses and how it should not be done. On the right is shown how we do it. The lintel inside is reinforced with metal, and the height is 20 centimeters.</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Interior and faсade plastering completed</title>
			<link>https://allengyo.com.tr/tpost/z9s11jhcu1-interior-and-fasade-plastering-completed</link>
			<amplink>https://allengyo.com.tr/tpost/z9s11jhcu1-interior-and-fasade-plastering-completed?amp=true</amplink>
			<pubDate>Wed, 10 Apr 2024 23:13:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild6565-3064-4761-b332-346431636138/photo_2024-04-10_23-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Interior and faсade plastering completed</h1></header><div data-block="gallery"><img src="https://static.tildacdn.com/tild6565-3064-4761-b332-346431636138/photo_2024-04-10_23-.jpg"/><img src="https://static.tildacdn.com/tild6363-3761-4630-b232-623935646561/photo_2024-04-10_23-.jpg"/></div><div class="t-redactor__text">04/07/2024 rough plastering work at the site was completed</div>]]>
			</turbo:content>
		</item>
		<item turbo="true">
			<title>Start of installation of internal engineering systems</title>
			<link>https://allengyo.com.tr/tpost/h9raxgaom1-start-of-installation-of-internal-engine</link>
			<amplink>https://allengyo.com.tr/tpost/h9raxgaom1-start-of-installation-of-internal-engine?amp=true</amplink>
			<pubDate>Wed, 10 Apr 2024 23:30:00 +0300</pubDate>
			<enclosure url="https://static.tildacdn.com/tild3132-3838-4734-b733-636361373932/photo_2024-04-10_23-.jpg" type="image/jpeg"/>
			<turbo:content>
<![CDATA[<header><h1>Start of installation of internal engineering systems</h1></header><figure><img src="https://static.tildacdn.com/tild3132-3838-4734-b733-636361373932/photo_2024-04-10_23-.jpg"/></figure><div class="t-redactor__text">04/08/2024 installation of internal engineering systems began. Marking is carried out with a laser level in strict accordance with the architectural and design project</div>]]>
			</turbo:content>
		</item>